ANGDA

Glennallen to Palmer Spur Line Engineering Report
Appendicies





The following files are in PDF format. Download the free Adobe Acrobat Reader by clicking on the button. 
Acrobat Reader

Appendix A
Alignment Sheets

The following Alignment
sheets are shown in two views:
• USGS Topographic 
~ Aerial Phtography

Caribou & Boulder Creek

Chickaloon

Sutton/Palmer

Realignments

Appendix B
Cost Estimate

 

Appendix C Construction Schedule

 

ANGDA Alignment Change Request 11-2-2005

Sheet 001 - Sheet 024
(23 MB)

Glennallen

Eureka

 

Home | JPO |TAPS | ANGTS | State Pipeline Coordinator's Office | Publications |JPO News| Strategic Reconfiguration | ANGDA Application

Please send your suggestions or comments to JPO
Page Updated 6/23/2008

411 W.4th Avenue, 2nd Floor
Anchorage, AK  99501
Phone: (907) 257-1300
Fax Number (907) 272-0690

Take Pride