The
Joint Pipeline Office

TAPS Lease & Amendments





The following files are in PDF format. Download the free Adobe Acrobat Reader by clicking on the button.
Acrobat Reader

TAPS Lease, ADL 63574

TAPS, No.1, Sec. 1dii, 6-24-81
TAPS, No. 2, PLMP 384.4, PIG Launcher-Receiver Facility, 1-14-93
TAPS, No. 3, PLMP 378.7, Erosion Control, Hess Creek, 6-2-94
TAPS, No. 4, PLMP 46.5 - 48.5, Spur Dikes 6, 7, 8; 6-2-94
TAPS, No. 5, PLMP 22, Spur Dike 3A, 10-4-94.

TAPS, No. 6, PLMP 76.7, Laydown Area, Material Storage, 10-21-94
TAPS, No. 7, PLMP 57.7 - PS 2 and 104.2 - PS 3, Maintenance Support Activities, 5-9-95
TAPS, No. 8, PLMP 231.5, Revetment, MFKR, 5-9-95
TAPS, No. 9, PLMP 196, Diversion Dike, Dietrich River Floodplain, 10-10-95
TAPS, No. 10, PLMP 243.6, Diversion Dike, MFKR, 3-5-96
TAPS, No. 11, 76 and 84, Anode Beds, Sag. River, 5-30-96
TAPS, No. 12, Relocate and maintain 800 ft. section of workpad to maintain vehicular access, 6-13-96
TAPS, No. 13, PLMPs 597 to 617, Cathodic Protection, Oxbow Lake, 8-7-96
TAPS, No. 14, Bank Stability, McCallum Creek, 8-30-96
TAPS, No. 15, DRA Injection Facility, 8-30-96
TAPS, No. 16, PLMPs, 790 to 800, Cathodic Protection, Dayville Road, 11-5-96
TAPS, No. 17, PLMPs 242.8 and 243.8, Diversion Dikes, MFKR, 2-19-97
TAPS, No. 18, PLMP 197.5, Bank Erosion, Dietrich River Floodplain, 9-8-97
TAPS, No. 19, PLMP 778.7, Cathodic Protection, Sheep Creek Camp, 9-10-98
TAPS, No. 20, PLMP 218.5, Revetment Structure, MFKR, 3-19-99
TAPS, No. 21, PLMP 686.7, Revetment Structure, Tazlina River, 4-1-99
TAPS, No. 22, PLMP 185.8, Revetment Structure, Dietrich River, 4-19-99
TAPS, No. 23, PLMP 76.0, Cathodic Protection, Sag. River, 10-14-99
TAPS, No. 24, PLMPs 18.7, 47.2 and 67.8; Cathodic Protection, 3-1-00
TAPS, No. 25, PLMP 367.2, Cathodic Protection, 6-19-00
TAPS, No. 26, PLMP 397.3, Cathodic Protection, Manley Hot Springs Road, 7-31-00
TAPS, No. 27, 687.0, Containment Berm and Diversion Dike, Tazlina River, 9-18-01
TAPS, No. 28, Sec. 2C, Renewal Term of up to 10 Years, 6-28-02
TAPS, No. 29, PLMP 72.3 Revetment, Sag. River, 8-5-02
TAPS, No. 30, PLMP 32.8, Revetment Structure, Sag. River, 9-13-02
TAPS, No. 31, Renewal of Lease, 30 Years, 11-26-02
TAPS, No. 32, PLMP 230, Revetment Structure, MFKR, 1-13-03
TAPS, No. 33, PLMP 228.9, Revetment, MFKR, 1-15-03
TAPS, No. 34, PLMP 219.5, Revetment, MFKR, 2-14-03
TAPS, No. 35, PLMP 217, Revetment Structure, MFKR, 1-23-04
TAPS, No. 36, PLMP 67.8, Revetment, Sag. River, 4-29-04
TAPS, No. 37, PLMP 242.8, Revetment, MFKR, 4-6-04
TAPS, No. 38, PLMP 271.4, Revetment, Jim River, 6-8-04
TAPS, No. 39, Power Line Tie-In, PS1, 1-20-05
TAPS, No. 40, PLMP 531.4, Bank Repairs, Tanana River, 4-4-05
TAPS, No. 41, PLMP 686.5, Bank Repairs, Tazlina River, 6-3-05
TAPS. No. 42, Revetment Structure, Dietrich River, 8-5-05
TAPS. No. 43, Stipulation 3.4.1.1, Linewide, 1-5-06
TAPS. No. 44, PLMP 39.3, Sag. River, Channel Weir, 3-15-06
TAPS. No. 45, PLMP 85 Sag. River, 4-17-06
TAPS, No. 46, PLMP 37.8 ,Grade Control Structure, Sag. River, 3-29-07
TAPS, No. 47, PLMP 24.7, Channel Plug Reconfiguration , Sag. River 7-18-07
Exhibit F Memos
Section 1.d (ii)

(top)

Home | JPO |TAPS | ANGTS | State Pipeline Coordinator's Office | Publications |JPO News| Strategic Reconfiguration | ANGDA Application

Please send your suggestions or comments to JPO
Page Updated 6/23/2008

411 W.4th Avenue, 2nd Floor
Anchorage, AK  99501
Phone: (907) 257-1300
Fax Number (907) 272-0690

Take Pride